Web Portals for Bangladesh Bangladesh News Bangla Music Bangladesh Mobile Bangladesh Sports
Subscribe to Bangladesh News RSS Feed Bangladesh News RSS Feed Add to Google Reader or Homepage Add to netvibes Add to Pageflakes  Windows Live Alerts
Get Daily News By Email:   
[ Add Bangladesh News To: Your Site/Blog, Facebook or Google Gadget ]

Mega transport project for greater Dhaka kicks off


Posted on Friday, August 29th, 2008 at 12:56 am
[ Comments RSS Comments RSS ] [ Trackback Link Trackback URL ] [ ] [ PDF Version Download PDF ]

The government yesterday launched a long-term mega project to establish an integrated environment-friendly traffic management system in greater Dhaka to relieve people of the present traffic congestion.

The 20-year Strategic Transport Plan (STP) includes 17,400 square km of water and surface ways of Dhaka and neighbouring Narayanganj, Narsingdi, Munshiganj, Gazipur and Manikganj districts.

Metro train services, elevated motorways, Bus Rapid Transit (BRT), construction of roads connecting the east of the capital to the west, flyovers, footbridges and new roads, and repair of the damaged thoroughfares are the main features of the plan. It is aimed to be safe, reliable and affordable and give pedestrians the highest priority in the city.

The total expenditure is estimated at $5.52 billion excluding the cost of land acquisition.

Launching the STP at Osmani Auditorium, Chief Adviser Fakhruddin Ahmed said implementation of the plan would provide city dwellers safety and alleviate congestion.

“Activities under the Strategic Transport Plan have already started to bring order in the city transport sector, remove traffic congestions and curb the level of air pollution,” he said at the launching ceremony regretting the financial loss and the loss of valuable working hours of commuters due to traffic congestions.

The STP is designed to be implemented in three phases. Six roads would be built to connect the east of the capital to the west and link the city to Dhaka bypass in the first phase. These roads are Zia Colony to Mirpur, Panthapath to Rampura, Tejgaon Airport Tunnel, Merul Badda to Golakandial, Tongi to Ghorashal and Malibagh to Janapath.

“It is essential to move forward immediately if the long-term plan is to succeed in a meaningful way in the first phase,” said the STP report, adding that the planning, designing, financing and other preparatory work for the three motorways are done and awaits implementation in the first and second phases.

Design guidelines would be made for the Mass Rapid Transit (MRT) systems, including BRT and Metro (underground railway) system, in the first phase, says the report.

Construction of 12 roads to have major advancement in the city’s infrastructure and completion of three elevated motorways will be done in the second phase. “Final design and finance plans for the first Metro Line [5] will be completed in this phase.”

The third phase, which has two parts, includes the designing and construction 16 roads aimed at opening up the eastern and western fringe areas. Preliminary engineering on 17 roads to be constructed in the second part of the third phase, final design and financing plans for the second and third Metro Line [4 and 6] and completion of the construction work of Metro Line 5 are scheduled for the first part of the third phase.

The second and final part of the third phase includes design and construction of the 17 roads aimed at completing the city motorway network, completion of Metro Line 4 and 6, the report says.

The cost of BRT has been estimated at $5 million per km while the cost of Metro Line construction has been estimated at $50 million per km on structure and $75 million per km underground.

Terming the launch the beginning of a new chapter, Fakhruddin said managing fund for such a mega project would be a challenge. He urged the donors to come forward.

The plan, however, has the option to launch concerted move to mobilise fund from government and private sectors.

“The Mass Rapid Transit system will be complete when the first part of the third phase is done,” said SM Salehuddin, additional executive director of Dhaka Transport Coordination Board, while giving a short presentation on the 20-year plan.

“We will also revive the rivers in and around the capital to integrate those with the land transport systems.”

Presiding over the function, Communication Adviser Ghulam Quader said the plan was endorsed in 2006 and blamed the previous government for not approving it for implementation.

“It is a landmark step for Dhaka residents,” he added.

Mahbubur Rahman, secretary to Roads and Highways Department of the communication ministry, gave the welcome speech at the ceremony which was also attended by a number of advisers, senior government officials and donors’ representatives.

“It is time to make the capital city habitable by cleansing it of environment pollution and traffic jam,” the chief adviser said.

He said his government has given an important consideration to the matter of increasing scope and facilities of city life alongside resolving people’s problems and fulfilling their expectations.

“This government already has taken initiative to further expedite the Dhaka Transport Coordination Board and laid special importance on advancing the STP which had been stuck for long,” he said.

Alongside increasing population, economic activities and industries have increased and so has the number of vehicles on the road, he said. Roads have not increased in proportion to the rate at which the number of vehicles increased.

“As a result, intolerable traffic jams, air and noise pollution and so on became a matter of city life. Civic amenities have decreased increasing suffering,” he said.

The present caretaker government approved the project this year against the backdrop of commuters’ abject suffering for outmoded transport system of the capital compounded with nagging traffic congestion that causes waste of valuable time in this high-speed age.

Construction and reconstruction of about 330km of roads and highways, including 50 new roads, flyovers, elevated motorways, Metro Lines, circular waterways, Bus Rapid Transit (BRT), Rapid Mass Transit (RMT), bus-route rationalisation, traffic-system development and protecting the environment are the major components of the STP.

Link to this news:
 
        
    
This entry was posted on Friday, August 29th, 2008 at 12:56 am and is filed under Bangla, Bangladesh, Bangladesh News, Daily Bangladesh News, News. You can follow any responses to this entry through the RSS 2.0 feed. You can skip to the end and leave a response. Pinging is currently not allowed.

Comments are not moderated and only expresses personal views of visitors. BangladeshNews.com.bd is not responsible for commets posted by visitors.

Leave a Reply

People come here looking for: Dhaka Transport Coordination Board (4), dhaka metro districts (2), dhaka- new route plan (2), bangladesh metro project (1), mass transport (1), STP project, Bangladesh (1), Strategic Transport Plan dhaka (1), bangladesh motorway (1), dhaka (1), stp, bangladesh (1), 5 major roads of dhaka city (1), mega feed in bangladesh (1), mega transport (1), STP for dhaka city (1), Dhaka Transport Coordination Board (1), Dhaka Project (1), proposal of MRT in dhaka (1), dhaka city bus route (1), Dhaka Transport Cordination Board (1), Traffic jam and air pollution in major city of Bangladesh (1), transport in dhaka (1), www.bangladesh transport (1), Transport problem in dhaka city (1), Dhaka transport and the daily star (1), dhaka transport and STP (1), Dhaka Subway Project 2008 (1), Capital city of Dhaka (1), Dhaka Integrated Transport Service (1), dhaka transport problem and the daily star (1), Dhaka Transportation Coordination Board (1), MEGATRANSPORT (1), Traffic jam and air pollution (1), new roads in dhaka city (1), Transport Project" for Dhaka city (1), dhaka transport problem (1), mega feed bangladesh (1), mega project in Bangladesh will it happen (1), address of dhaka transport coordination board office (1), B.R.T In Bangladesh (1), ADB report on MRT construction in the cities (1), report on traffic jam dhaka (1), STP+Bangladesh (1), dhaka projects (1), STP for dhaka (1), BRT in bangladesh (1), New proposed mega project for bangladesh (1), Strategic Traffic Plan for Dhaka city (1), transportation system of dhaka (1), Greater Dhaka Transport Planning (1), how to remove traffic jam from dhaka city (1),